Cavity wall insulation problems: signs, causes and unsuitable homes

Cavity wall insulation is meant to sit quietly inside your walls without you thinking about it. When something seems wrong, such as a damp patch that was not there before or a room that feels colder than it should, it is natural to wonder whether the insulation is to blame. This guide walks through the signs people look for, the outside causes worth ruling out first, the walls that may not have been suitable, and how the CIGA guarantee and concern process works.

We are an independent information site. We do not fit or remove insulation, and nothing here replaces an inspection of your own home.

Signs people check for

There is no single sign that proves cavity wall insulation has failed, and many of these can have other causes. They are simply the things worth looking at and writing down before you contact anyone:

  • Damp patches on inside walls, especially on outside-facing walls and in areas that were dry before the work.
  • Cold spots on a wall that feels noticeably colder to the touch than the rest of the room.
  • Mould or black spotting around window reveals, corners or behind furniture placed against an outside wall.
  • Peeling paint or wallpaper, or plaster that looks stained or blown.
  • Damp that follows the weather, getting worse after rain blows against one side of the house.

Take dated photos, note which walls and rooms are affected, and keep a simple diary of when the problem appears. That record is useful whoever you end up speaking to.

Common outside causes to rule out first

CIGA's consumer concerns page says to first check obvious external causes, and gives blocked gutters and earth piled against walls as examples. These are worth checking because they can let water reach a wall whether or not it has been insulated.

Gutters and downpipes

A blocked or leaking gutter can pour water down the face of a wall every time it rains. Look for staining on the outside brickwork below the gutter line, plants growing out of the gutter, or a downpipe that has come loose. Clearing or repairing it is often the simplest first step.

Earth and paving against the walls

Soil from a flower bed, a raised patio or a path built up against the house can bridge the lower part of a wall and let moisture in. Check whether ground levels outside are higher than they used to be, especially where the damp inside is low down on the wall.

Other things to look at

While you are outside, it is sensible to look for cracked render, gaps around window frames and damaged pointing. You are not trying to diagnose the problem yourself, just making sure an obvious outside fault is not missed before the insulation is blamed.

Walls that may not have been suitable

CIGA says the installer assesses suitability first, before any cavity wall insulation is fitted. Sometimes, though, homeowners later wonder whether their walls were right for it at all.

One clue is the brick pattern. CIGA notes that end bricks in the face suggests that the wall may not contain a cavity. In other words, if you can see the short ends of bricks laid across the wall at regular intervals, rather than only long brick faces, the wall may be solid. If a solid wall had cavity insulation fitted, or the suitability check was not done properly, raise that with the installer and CIGA.

If your home had solid wall insulation through GBIS or ECO4 instead, that has a separate route. Gov.uk publishes guidance on poor-quality wall insulation, and our guide to GBIS problems explains the steps in plain terms.

The CIGA guarantee

According to the CIGA guarantee holders page, CIGA provides independent 25-year guarantees for cavity wall insulation fitted by registered installers in the UK and the Channel Islands. Key points:

  • The guarantee is transferable when a house is sold and stays valid for later owners.
  • Claims must be notified within 25 years of installation.
  • The maximum rectification value is currently £20,000.
  • The guarantee is not valid if the insulation has been altered or disturbed.
  • A duplicate guarantee costs £60 including VAT. Email guarantees@ciga.co.uk with proof of ownership and a recent utility bill.

The point about altered or disturbed insulation matters. Before anyone drills test holes, removes insulation or tops it up, speak to CIGA so you do not affect your cover.

The CIGA concern process and its timelines

CIGA sets out a clear order. Contact the installer first. CIGA says the installer should respond within 24 hours. If the issue is not resolved within 41 working days, contact CIGA, which you can do through its register a concern page. You should also tell CIGA if a problem has not been resolved within 2 months.

StageTimeline CIGA gives
Installer responds to your concernWithin 24 hours
Contact CIGA if unresolved by the installerAfter 41 working days
CIGA acknowledges your concernWithin 2 working days
CIGA inspectsWithin 5 working days
CIGA sends a written reportWithin 27 working days
Simple cases completedUp to 50 working days in total
Complex cases completedUp to 90 working days

If a defect is confirmed, CIGA says the remedial work is carried out without charge to you. If you disagree with the outcome, disputes can go to independent arbitration by CEDR.

When total cavity clearance comes up

Not every problem needs the insulation taken out. Some are fixed by sorting an outside fault, and some by more limited remedial work. CIGA gives "total cavity clearance with drying out period" as an example of complex works, which is the kind of case that can take up to 90 working days.

In practice, clearance tends to come up after an inspection has found a defect that cannot be put right in a simpler way. If you are wondering whether it applies to your home, our guide to cavity wall insulation removal covers how it fits with the guarantee and what to ask before agreeing to any work.

Before agreeing to removal

  • Check that an outside cause, such as a gutter or raised ground, has been ruled out.
  • Find your CIGA guarantee, or request a duplicate.
  • Contact the installer first, then CIGA if needed, before anyone disturbs the insulation.
  • Be wary of anyone who knocks on the door offering to remove insulation for a fee without an inspection.

If the work was done through GBIS

The Great British Insulation Scheme began in April 2023 and ended on 31 March 2026, according to the Ofgem GBIS page. It mostly funded single insulation measures. If your cavity wall insulation was fitted under the scheme by a registered installer, the CIGA route above still applies. For complaints about how the scheme itself was delivered, the gov.uk GBIS page points to the Ofgem ECO complaints guidance.

Frequently asked questions

How do I know if my cavity wall insulation is causing damp?

You cannot be sure without an inspection. Note damp patches, cold spots and mould, take dated photos, and check outside causes such as blocked gutters or earth piled against the walls first, as CIGA suggests.

How can I tell if my wall has a cavity?

CIGA says end bricks in the face suggests the wall may not contain a cavity. The installer is meant to assess suitability before fitting.

How long does the CIGA guarantee last?

CIGA guarantees last 25 years. They transfer when the house is sold and stay valid for later owners, but they are not valid if the insulation has been altered or disturbed.

What if I have lost my CIGA guarantee?

You can request a duplicate for £60 including VAT by emailing guarantees@ciga.co.uk with proof of ownership and a recent utility bill.

How long does a CIGA concern take?

CIGA acknowledges within 2 working days, inspects within 5 working days and sends a written report within 27 working days. Simple cases take up to 50 working days in total and complex ones up to 90.

Will I have to pay if a defect is found?

CIGA says remedial work is carried out without charge if a defect is confirmed, and the maximum rectification value is currently £20,000.

Sources: CIGA consumer concerns, register a concern and guarantee holders pages, the Ofgem GBIS page, the Ofgem ECO complaints process and gov.uk poor-quality wall insulation guidance (read 19 October 2026).

Want a second opinion on where to start?

If you are not sure whether your problem is an outside fault, a guarantee claim or something else, use the after-GBIS checker; we reply by email with the routes that fit your home.

Ask us about your home

Tell us your question and postcode. We reply by email.

See privacy.

Published 2026-10-19. Independent guide; scheme rules change, so confirm with the scheme before you rely on them.